Severn Tunnel Electrification, Network Rail

sector

Transportation

project type

Adaptation

location

United Kingdom

Situation

  • Network rail required a solution to carry the insulated ATF Cable required in the electrification of the Severn Tunnel project.

  • The solution had to withstand the aggressive conditions as well as ensure a 40-year product design life.

Solution

  • Ellis worked closely with Network Rail to adapt the proven 2F cable guide clamp by creating a bespoke fixing bracket that was manufactured in-house from Super Duplex Stainless Steel.

Ellis Holding Power Logo
Ellis Holding Power BSI

Ellis Patents Ltd.
High Street,
Rillington, Malton,
North Yorkshire YO17 8LA
United Kingdom