sector
Major Infrastructure
project type
Structure
location
United Kingdom
Following Ellis’s supply of steelwork for the Wear Crossing project, Ellis was approached to provide a steelwork solution for the Springhead Bridge.
The main bridge design had been finalised, but the structure for supporting power cable-carrying ducts remained incomplete.
Ellis’s technical team conducted site visits and received detailed bridge structural drawings.
Using this data, they created a 3D CAD model and developed a design tailored to meet the project requirements.
A unique challenge emerged: The supports needed varying heights due to the bridge’s geometry.
To streamline installation and avoid on-site confusion, a single design offering a range of heights was devised.
Meeting a tight deadline, off-the-shelf materials were used.
Strength validation occurred through a combination of hand calculations and 3D CAD analysis.
Ellis Patents Ltd.
High Street,
Rillington, Malton,
North Yorkshire YO17 8LA
United Kingdom
© Ellis Patents 2024 | Terms and Conditions | Cookie Policy | Sitemap
Website by Askew/Brook