Balfour Beatty: Summit Tunnel Track Renewal

sector

Transportation

project type

Adaptation

location

United Kingdom

Situation

  • Balfour Beatty subcontracted ISS Labour Ltd to replace the troughing route on the Summit Tunnel in Todmorden, Yorkshire with cable hangers.

  • The cable hangers needed to be fitted to the tunnel wall at 1m intervals with the bottom bracket installed at rail height.

Solution

  • Pegasus Cable Hangers were chosen because they offered a high quality, non-corrosive, lightweight & modular solution.

  • The modular 4 way hanger offered a combination of 100mm hooks and a control style bottom hook which matched the project requirements perfectly.

  • 1200 units were supplied within a limited timeframe to suit the track access timetable.