Balfour Beatty subcontracted ISS Labour Ltd to replace the troughing route on the Summit Tunnel in Todmorden, Yorkshire with cable hangers.
The cable hangers needed to be fitted to the tunnel wall at 1m intervals with the bottom bracket installed at rail height.
Pegasus Cable Hangers were chosen because they offered a high quality, non-corrosive, lightweight & modular solution.
The modular 4 way hanger offered a combination of 100mm hooks and a control style bottom hook which matched the project requirements perfectly.
1200 units were supplied within a limited timeframe to suit the track access timetable.